Skip to content
ElectriCities of North Carolina, Inc. (logo)
ElectriCities Portal
  • About Us
    • Who We Are
    • ElectriCities Member Benefits
    • 2025 Value Summary
    • Leadership
    • Inclusion and Diversity
    • Contact List
    • Careers
      • Submit a Job
        (Members Only)
  • Public Power
    • The Value of Public Power
    • Our Communities
    • Issues & Policy
    • Our Communities
  • Services
    • Emergency Assistance
      • Outage Map
    • Learning & Development
    • Legislative Affairs and Political Engagement
    • Economic Development
      • Economic Development Staff
      • Smart Sites®
      • DEVELOPMENTS
      • Economic Development Resources
      • Economic Excellence Awards
    • Commercial & Industrial Services
      • Business Services Staff
      • Commercial and Industrial Customer Energy Saving Tips
    • Corporate Communications
      • Bill Inserts Request Form
      • Business Card Order Form
      • Customized City Projects
      • P4 Program
    • Residential Services
    • Operations
    • Grid Innovation & Technology Services
    • Customer Service
      • Phil’s 2-Minute Drills
  • Resources
    • Career Development
    • Listserv Signup
    • Member Toolkits
      • Severe Weather and Outage Resources
      • Cold Weather Resources
      • Mutual Aid Communication Resources
    • NCEMPA Renewable QFs
    • Outage Map
    • Presentations
      • 2022 Annual Conference Presentations
    • Public Power
      Awards of Excellence
    • Public Power Week Resources
      • Public Power Week 2026
        Oct. 4-10
    • Purchasing Resources
    • Resource Library
    • TempTracker 365™
    • Vendor / Customer Payment Resources
  • News & Events
    • Newsroom
    • Media & Press
    • Weekly Wire
    • Social Hub
    • Meetings
      • BOD & BOC Meetings
    • Connections Summit 2027
      • 2027 Connections Summit Sponsorship Opportunities
    • Awards and Accolades
    • Testimonials

Tag: cold

Transitioning to Winter Load Management

Whether your community’s load management programs use switches, generators, or both, October and November are the perfect months to start planning for the winter chill. The details may differ for each community, but the goal is the same: Reduce your wholesale power costs by decreasing the demand on your electric system when demand is highest.

Residential Load Management

Participating in a residential load management program involves having a remotely controlled switch attached to customers’ appliances that have the most impact on peak demand.

“October through early November is a good time to inform those customers who aren’t participating in load management about how your program works and the value of it,” says Brandon Rummage, Manager of System Operations at ElectriCities.

Those already participating need a different message. Transitioning from summer to winter means:

  1. Different appliances are affected. Water heaters are typically controlled year-round, but heat strips replace air conditioners in the winter months.
  2. Load management time of day changes. In winter, peak demand is usually from 7 a.m. to 9 a.m. Summer peaks are typically in the afternoon.

Utility, Commercial, and Industrial Load Management

Much of non-residential load management involves generators on both sides of the meter. Whether your program involves generators owned by the City or Town or by the customer, take time now to get them ready for winter.

Jack Yox, Supervisor of Distributed Resources at ElectriCities, advises:

  1. Check for leaks, puddles, or other issues that need to be addressed before running your generator(s).
  2. Ensure coolant and oil are at the appropriate levels.
  3. Make sure block heaters are functioning properly so you can avoid starting a cold engine.
  4. Make sure your batteries are fully charged and the battery charger is working properly.
  5. Examine air intakes and enclosure for debris, water intrusion, snow, or nesting that can obstruct air flow to the generator.

“Almost every member participates in load management in some form, which collectively saves them millions of dollars each year,” Brandon said. “Taking timely steps to prepare to manage the winter demand peaks now ensures your utility and your customers don’t miss out on those savings.”

For more information about transitioning to winter load management, contact Brandon Rummage.

  • Careers
  • Financials
  • Contact Us
  • Site Map
  • Facebook
  • YouTube
  • Twitter
  • LinkedIn
  • Instagram

Copyright 2026 ElectriCities of North Carolina Inc. • All rights reserved • Privacy policy